Impact of tourism on long-run economic growth of Vietnam W Shih, NTH Do Modern Economy 7 (03), 371-376, 2016 | 31 | 2016 |
Distributed artificial intelligence in manufacturing systems control W Shih, K Srihari Computers & Industrial Engineering 29 (1-4), 199-203, 1995 | 30 | 1995 |
Expert system based placement sequence identification for surface mount PCB assembly W Shih, K Srihari, J Adriance The International Journal of Advanced Manufacturing Technology 11, 413-424, 1996 | 28 | 1996 |
Destination decision-making process based on a hybrid MCDM model combining DEMATEL and ANP: The Case of Vietnam as a Destination THN Do, W Shih Modern Economy 7 (9), 966-983, 2016 | 22 | 2016 |
Economic discrete replacement policy subject to increasing failure rate shock model MT Lai, W Shih, KY Tang The international journal of advanced manufacturing technology 27, 1242-1247, 2006 | 19 | 2006 |
Yield estimation through component placement accuracy evaluation in surface mount PWB assembly W SHIH, YUWEN HUANG, K Srihari, GR WESTBY Journal of Electronics Manufacturing 6 (01), 51-63, 1996 | 5 | 1996 |
The hybrid heuristic system in balancing the PCB assembly line of surface mount technology with multiple placement machines W Shih International Journal of Electronic BusinessManagement 7 (1), 37, 2009 | 3 | 2009 |
Estimation of yield through component placement accuracy in surface mount PWB assembly W Shih, YW Huang, K Srihari, GR Westby Computers & Industrial Engineering 29 (1-4), 607-611, 1995 | 3 | 1995 |
Development of Stock Evaluation System based on Quasi-Linear Regression Model Y Lin, W Shih, J Hu International Journal of Electronic Business Management 11 (1), 23, 2013 | | 2013 |
以 FMEA 分析網路犯罪及其未來防治與管理 施武榮, 梁馨科, 張廣志 2010 中國工業工程學會學術研討會論文集, 台南: 南台科技大學, B16-4, 1-8, 2011 | | 2011 |
具時間限制之單一物流中心車輛途程問題之研究-以粒子演算法求解 (32464) 蔡宏林, 施武榮 管理與資訊系, 2010 | | 2010 |
應用中央合成設計於粉體塗裝製程參數最佳化之研究-1 (32163) 胡又元, 施武榮 管理與資訊系, 2010 | | 2010 |
最適服務水準之低成本存貨模式研究 (30397) 吳嘉梓, 施武榮 管理與資訊系, 2010 | | 2010 |
前置時間為常態分配之整合性存貨模式之研究 (29094) 田書帆, 施武榮 管理與資訊系, 2010 | | 2010 |
降低持有成本之整合性存貨模式研究 (28067) 林顯儒, 施武榮 管理與資訊系, 2010 | | 2010 |
應用六標準差於品質改善之研究-以汽車煞車零件為例 (27797) 林良達, 施武榮 管理與資訊系, 2010 | | 2010 |
產能限制下單一產品與多個供應商整合性存貨模式之研究 (23430) 劉俊男, 施武榮 管理與資訊系, 2010 | | 2010 |
以模擬法求解多個軟體開發專案排程問題 (23553) 朱獻翔, 施武榮 管理與資訊系, 2010 | | 2010 |
一種改良的啟發式方法以建構名目屬性之二元決策樹 葉榮懋, 施武榮, 徐芳玲 資訊管理學報 17 (1), 157-176, 2010 | | 2010 |
The Development of a BPN Data Mining Calibration System in a SMT PCB Assembly Line. W Shih International Journal of Electronic Business Management 7 (4), 2009 | | 2009 |