BIM integrated smart monitoring technique for building fire prevention and disaster relief YW Cheng, M.Y., Chiu, K.C., Hsieh, Y.M., Yang, I-Tung,, Chou, J.S., and Wu Automation in Construction, 14-30, 2017 | 212 | 2017 |
Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis IT Yang Journal of Construction Engineering and Management 133 (7), 498-505, 2007 | 148 | 2007 |
Discussion of “Comparison of Linear Scheduling Model and Repetitive Scheduling Method” by Kris G. Mattila and Amy Park PG Ioannou, IT Yang Journal of Construction Engineering and Management, 2004 | 118* | 2004 |
Optimal path planning in real time for dynamic building fire rescue operations using wireless sensors and visual guidance JS Chou, MY Cheng, YM Hsieh, IT Yang, HT Hsu Automation in Construction 99, 1-17, 2019 | 110 | 2019 |
Probabilistic simulation for developing likelihood distribution of engineering project cost JS Chou, IT Yang, WK Chong Automation in Construction 18 (5), 570-577, 2009 | 102 | 2009 |
Simulation-based estimation for correlated cost elements IT Yang International Journal of Project Management 23 (4), 275-282, 2005 | 93 | 2005 |
Applying the AHP to support the best-value contractor selection–lessons learned from two case studies in Taiwan WC Wang, W Yu, IT Yang, CC Lin, MT Lee, YY Cheng Journal of Civil Engineering and Management 19 (1), 24-36, 2013 | 89 | 2013 |
Performing complex project crashing analysis with aid of particle swarm optimization algorithm IT Yang International Journal of Project Management 25 (6), 637-646, 2007 | 78 | 2007 |
Performing complex project crashing analysis with aid of particle swarm optimization algorithm IT Yang International Journal of Project Management 25 (6), 637-646, 2007 | 78 | 2007 |
Impact of budget uncertainty on project time-cost tradeoff IT Yang IEEE Transactions on engineering management 52 (2), 167-174, 2005 | 71 | 2005 |
Stochastic resource-constrained scheduling for repetitive construction projects with uncertain supply of resources and funding IT Yang, CY Chang International Journal of Project Management 23 (7), 546-553, 2005 | 59 | 2005 |
Repetitive scheduling method: Requirements, modeling, and implementation PG Ioannou, IT Yang Journal of Construction Engineering and Management 142 (5), 04016002, 2016 | 56 | 2016 |
Automatic repair of inconsistent pairwise weighting matrices in analytic hierarchy process IT Yang, WC Wang, TI Yang Automation in Construction 22, 290-297, 2012 | 55 | 2012 |
Chance-constrained time–cost tradeoff analysis considering funding variability IT Yang Journal of construction engineering and management 131 (9), 1002-1012, 2005 | 54 | 2005 |
Resource-constrained scheduling for continuous repetitive projects with time-based production units M Hsie, CJ Chang, IT Yang, CY Huang Automation in Construction 18 (7), 942-949, 2009 | 52 | 2009 |
Resource-driven scheduling for repetitive projects: a pull-system approach IT Yang, PG Ioannou Proceedings of the 9th International Group for Lean Construction Conference …, 2001 | 52 | 2001 |
An invisible head marker tracking system for indoor mobile augmented reality C Kuo, T Jeng, I Yang Automation in Construction 33, 104-115, 2013 | 51 | 2013 |
Scheduling system with focus on practical concerns in repetitive projects IT Yang, PG Ioannou Construction Management and Economics 22 (6), 619-630, 2004 | 51 | 2004 |
Reliability-based design optimization with discrete design variables and non-smooth performance functions: AB-PSO algorithm IT Yang, YH Hsieh Automation in construction 20 (5), 610-619, 2011 | 50 | 2011 |
Reliability-based design optimization with cooperation between support vector machine and particle swarm optimization IT Yang, YH Hsieh Engineering with Computers 29 (2), 151-163, 2013 | 47 | 2013 |