追蹤
Dr.Farzad Tahriri
Dr.Farzad Tahriri
Ph.D. in Industrial and System Engineering - Project Manager (UT)
在 ut.ac.ir 的電子郵件地址已通過驗證 - 首頁
標題
引用次數
引用次數
年份
AHP approach for supplier evaluation and selection in a steel manufacturing company
F Tahriri, MR Osman, A Ali, R Yusuff, A Esfandiary
Journal of Industrial Engineering and Management (JIEM) 1 (2), 54-76, 2008
2342008
A review of supplier selection methods in manufacturing industries
F Tahriri, MR Osman, A Ali, RM Yusuff
Research Institute and Development. Suranaree University of Technology, 2008
2092008
Multi-objective AGV scheduling in an FMS using a hybrid of genetic algorithm and particle swarm optimization
M Mousavi, HJ Yap, SN Musa, F Tahriri, SZ Md Dawal
PloS one 12 (3), e0169817, 2017
1322017
The application of fuzzy Delphi and fuzzy inference system in supplier ranking and selection
F Tahriri, M Mousavi, S Hozhabri Haghighi, S Zawiah Md Dawal
Journal of Industrial Engineering International 10, 1-16, 2014
792014
Application of value stream mapping using simulation to decrease production lead time: a Malaysian manufacturing case
A Esfandyari, MR Osman, N Ismail, F Tahriri
International Journal of Industrial and Systems Engineering 8 (2), 230-250, 2011
552011
Empirical evidence of AMT practices and sustainable environmental initiatives in malaysian automotive SMEs
SZM Dawal, F Tahriri, YH Jen, K Case, NH Tho, A Zuhdi, M Mousavi, ...
International Journal of Precision Engineering and Manufacturing 16, 1195-1203, 2015
432015
Selecting a CNC Machine Tool Using the Intuitionistic Fuzzy TOPSIS Approach for FMC,
Nguyen Huu Tho, Siti Zawiah Md Dawal, Nukman Yusoff, Farzad Tahriri, Hideki ...
Applied Mechanics and Materials 315 (1662-7482), 196-205, 2013
42*2013
OPTIMIZING THE ROBOT ARM MOVEMENT TIME USING VIRTUAL REALITY ROBOTIC TEACHING SYSTEM
F Tahriri, M Mousavi, HJ Yap, Z Siti Zawiah, M. D. & Taha
International Journal of Simulation Modelling 14 (1), http://www.ijsimm.com …, 2015
322015
Analytical hierarchy process for the selection of advanced manufacturing technology in an aircraft industry
Z Taha, Z Banakar, F Tahriri
International Journal of Applied Decision Sciences 4 (2), 148-170, 2011
292011
Supplier Assessment and Selection Using Fuzzy Analytic Hierarchy Process in a Steel Manufacturing Company
F Tahriri, M Dabbagh, AE Nader
Journal of Scientific Research and Reports, ISSN: 2320–0227 3 (10), 1319-1338, 2014
212014
Justification and Classification of Issues for the Selection and Implementation of Advanced Manufacturing Technologies
Z Banakar, F Tahriri
International Conference on Innovation, Engineering Management and …, 2010
172010
Does a long reference list guarantee more citations? Analysis of Malaysian highly cited and review papers
N Ale Ebrahim, H Ebrahimian, M Mousavi, F Tahriri
The International Journal of Management Science and Business 1 (3), 6-15, 2015
152015
Job sequencing and layout optimization in virtual production line
Z Taha, F Tahriri, A Zuhdi
品質學報 18 (4), 351-374, 2011
102011
A classification of different type of facility layout design
Z Taha, A Zuhdi, F Tahriri
62008
Multiobjective fuzzy mixed assembly line sequencing optimization model
F Tahriri, S Zawiah Md Dawal, Z Taha
Journal of Applied Mathematics 2014, 2014
52014
Critical success factors for technology selection specifically ROBOTS
F Tahriri, Z Taha
Journal of Business Management and Economics 2 (3), 089-097, 2011
52011
LEAN PRODUCTION TOOLS AND TECHNIQUES APPLICATION TOWARD MORE PRODUCTIVITY IN TEXTILE INDUSTRIES
A Esfandyari, MR Osman, F Tahriri, R Riedel
International Journal of Industrial and System Engineering, Vol.8, No.2, P …, 2011
5*2011
The concept of Integrating Virtual Group (VG) and Agile Supplier Selection (ASS)
F Tahriri, Z Taha
Journal of Business Management and Economics - http://e3journals.org/cms …, 2010
52010
Fuzzy mixed assembly line sequencing and scheduling optimization model using multiobjective dynamic fuzzy GA
F Tahriri, SZM Dawal, Z Taha
The Scientific World Journal 2014, 2014
42014
CRITICAL SUCCESS FACTORS FOR ADVANCED MANUFACTURING TECHNOLOGY (AMT)
Z TAHA, F TAHRIRI
32012
系統目前無法執行作業,請稍後再試。
文章 1–20