Penilaian risiko K3 dengan metode HIRARC E Triswandana UKaRsT 4 (1), 96-108, 2020 | 76 | 2020 |
Penerapan Rekayasa Nilai pada Proyek Pembangunan Gedung Sekolah (Studi Kasus Pembangunan Gedung Sekolah Sanur Independent School) NM Jaya, A Yana, I Triswandana Jurnal Spektran 7 (1), 244-253, 2019 | 10 | 2019 |
The usage of a value engineering method for implementing green construction on the post graduate’s building at Warmadewa University PG Suranata, PI Wahyuni, I Triswandana Journal of Physics: Conference Series 1402 (2), 022003, 2019 | 4 | 2019 |
Pemberdayaan Obyek Guna Lahan Di Kawasan Desa Sanur Sebagai Alternatif Ruang Terbuka Hijau (RTH) Kota Denpasar NK Armaeni, PG Suranata, IWGE Triswandana Jurnal Sutramas 1 (1), 2021 | 3 | 2021 |
Best Contractor practice innovations in managing risk during the Pandemic PI Wahyuni, PG Suranata, AAG Sumanjaya, IW Muliawan, ... INTERNATIONAL JOURNAL OF CONSTRUCTION SUPPLY CHAIN MANAGEMENT 12 (2), 108-123, 2022 | 1 | 2022 |
RENCANA KESELAMATAN KONSTRUKSI (RKK) PROYEK PEMBANGUNAN GEDUNG BRI KANTOR CABANG GATOT SUBROTO–BALI PADA TAHAP KONSTRUKSI INY Darmika, NK Armaeni, IWGE Triswandana Jurnal Teknik Gradien 14 (02), 82-88, 2022 | 1 | 2022 |
RENCANA KESELAMATAN KONSTRUKSI PROYEK PEMBANGUNAN SMAN 9 DENPASAR PADA TAHAP STRUKTUR INS Jody, NK Armaeni, IWGE Triswandana Jurnal Teknik Gradien 13 (2), 12-21, 2021 | 1 | 2021 |
Tanjung Pura interchange bridge pillar analysis based on SP colomn value G Suartana, IN Sinarta, IWGE Triswandana Journal of Infrastructure Planning and Engineering (JIPE) 3 (1), 30-34, 2024 | | 2024 |
Desain Detail Konservasi Pura Pajinengan Gunung Tap Sai Di Kabupaten Karangasem IPAWA Adnyana, IN Warnata, IW Runa, IWGE Triswandana Jurnal Sutramas 3 (1), 87-94, 2023 | | 2023 |
PERENCANAAN PELAKSANAAN PEKERJAAN PILE CAP PADA PROYEK PEMBANGUNAN GEDUNG IGD UPT RUMAH SAKIT NYITDAH TABANAN EA Putri, NK Armaeni, IWGE Triswandana Jurnal Teknik Gradien 15 (01), 1-8, 2023 | | 2023 |
The Potential Of Land Use Objects In The Area Of Sanur Kaja Village As A Tourist Attraction SP Gede, NK Armaeni, IWGE Triswandana Jurnal Sutramas 2 (1), 18-23, 2022 | | 2022 |
The Utilization Of Black Stone Waste As An Alternative Material To Replace Partial Cement And Aggregate In Concrete ETPACW 3) International Journal of Innovative Science, Engineering, and Technology 8 …, 2021 | | 2021 |
Kajian Manajemen Risiko dalam Proyek Kerjasama Pemerintah Swasta (KPS)/Kerjasama Pemerintah Badan Usaha (KPBU) dengan Menggunakan Metode House Of Risk (HOR) PI Wahyuni, PG Suranata, PGE Triswandana JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK, UNIVERSITAS SYIAH KUALA 1, 618-625, 2019 | | 2019 |
Pengendalian Proyek Berbasis Risiko Pada Proyek Embung Tukad Unda Di Klungkung Bali PI Wahyuni, IWGE Triswandana, PPGP Pertama, P Asih, ... | | |