Lee Tien-Sheng
Lee Tien-Sheng
Professor Emeritus, Department of Supply Chain and Information Management
在 hsmc.edu.hk 的電子郵件地址已通過驗證 - 首頁
標題引用次數年份
An international study of quality improvement approach and firm performance
EE Adam, LM Corbett, BE Flores, NJ Harrison, TS Lee, BH Rho, J Ribera, ...
International Journal of Operations & Production Management 17 (9), 842-873, 1997
4261997
A taxonomy of manufacturing strategies in China
X Zhao, CC Sum, Y Qi, H Zhang, TS Lee
Journal of Operations Management 24 (5), 621-636, 2006
1892006
Freezing the master production schedule for material requirements planning systems under demand uncertainty
X Zhao, TS Lee
Journal of operations management 11 (2), 185-205, 1993
1581993
Quality management and organizational context in selected service industries of China
X Zhao, ACL Yeung, TS Lee
Journal of Operations Management 22 (6), 575-587, 2004
1442004
Forecasting error evaluation in material requirements planning (MRP) production-inventory systems
TS Lee, EE Adam Jr
Management Science 32 (9), 1186-1205, 1986
1281986
Senior management perspectives and ISO 9000 effectiveness: an empirical research
ACL Yeung, TS Lee, LY Chan
International Journal of Production Research 41 (3), 545-569, 2003
1232003
Freezing the master production schedule under single resource constraint and demand uncertainty
J Xie, X Zhao, TS Lee
International Journal of Production Economics 83 (1), 65-84, 2003
962003
An empirical taxonomy for quality management systems: a study of the Hong Kong electronics industry
ACL Yeung, LY Chan, TS Lee
Journal of Operations Management 21 (1), 45-62, 2003
802003
An empirical taxonomy for quality management systems: a study of the Hong Kong electronics industry
ACL Yeung, LY Chan, TS Lee
Journal of Operations Management 21 (1), 45-62, 2003
802003
Impact of forecasting error on the performance of capacitated multi-item production systems
J Xie, TS Lee, X Zhao
Computers & Industrial Engineering 46 (2), 205-219, 2004
682004
Pooling data across transparently different groups of key informants: measurement equivalence and survey research
M Rungtusanatham, CH Ng, X Zhao, TS Lee
Decision Sciences 39 (1), 115-145, 2008
632008
The convergent and predictive validity of quality and productivity practices in Hong Kong industry
TS Lee
Total Quality Management 10 (1), 73-84, 1999
521999
Lot-sizing rules and freezing the master production schedule in material requirements planning systems under demand uncertainty
X Zhao, JC Goodale, TS Lee
International Journal of Production Research 33 (8), 2241-2276, 1995
511995
Quality/productivity practices and company performance in China
CC Lee, TS Lee, C Chang
International Journal of Quality & Reliability Management 18 (6), 604-625, 2001
502001
Quality management
G Liu
Tsinghua University Press, Beijing, 1996
421996
Evaluation of safety stock methods in multilevel material requirements planning (MRP) systems
X Zhao, F Lai, TS Lee
Production Planning & Control 12 (8), 794-803, 2001
412001
Freezing the master production schedule in multilevel material requirements planning systems under deterministic demand
X ZHAO, TS Lee
Production Planning & Control 7 (2), 144-161, 1996
381996
Quality management initiatives in Hong Kong’s banking industry: A longitudinal study
EY Li, X Zhao, T Lee
Total Quality Management 12 (4), 451-467, 2001
342001
A study of quality management practices and performance in Asia and the South Pacific
LM Corbett, EE Adam Jr, NJ Harrison, TS Lee, BH Rho, D Samson
International Journal of Production Research 36 (9), 2597-2607, 1998
341998
AN EVALUATION OF FORECAST ERROR IN MASTER PRODUCTION SCHEDULING FOR MATERIAL REQUIREMENTS PLANNING SYSTEMS.
TS Lee, EE Adam Jr, RJ Ebert
Decision Sciences 18 (2), 292-307, 1987
291987
系統目前無法執行作業,請稍後再試。
文章 1–20