追蹤
Giovanni C Migliaccio
Giovanni C Migliaccio
Professor and Chair, Department of Construction Management, University of Washington
在 uw.edu 的電子郵件地址已通過驗證 - 首頁
標題
引用次數
引用次數
年份
Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods
DR Hale, PP Shrestha, GEJ Gibson, GC Migliaccio
Journal of Construction Engineering and Management 135 (7), 579 - 587, 2009
4122009
Data fusion of real-time location sensing and physiological status monitoring for ergonomics analysis of construction workers
T Cheng, GC Migliaccio, J Teizer, UC Gatti
Journal of Computing in Civil engineering 27 (3), 320-335, 2013
2282013
Automated task-level activity analysis through fusion of real time location sensors and worker's thoracic posture data
T Cheng, J Teizer, GC Migliaccio, UC Gatti
Automation in Construction 29, 24-39, 2013
2192013
Wearable sensors for monitoring on-duty and off-duty worker physiological status and activities in construction
W Lee, KY Lin, E Seto, GC Migliaccio
Automation in Construction 83, 341-353, 2017
1722017
Physiological condition monitoring of construction workers
UC Gatti, S Schneider, GC Migliaccio
Automation in Construction 44, 227-233, 2014
1462014
Public Private Partnerships in the US transportation sector
AMA Aziz, GC Migliaccio
Public private partnerships, 385-421, 2015
99*2015
Benchmarking of large design–build highway projects: One-to-one comparison and comparison with design–bid–build projects
PP Shrestha, GC Migliaccio, JT O'Connor, GE Gibson Jr
Transportation research record 1994 (1), 17-25, 2007
892007
Construction equipment management
JE Schaufelberger, GC Migliaccio
Routledge, 2019
862019
An exploratory study of the relationship between construction workforce physical strain and task level productivity
UC Gatti, GC Migliaccio, SM Bogus, S Schneider
Construction management and economics 32 (6), 548-564, 2014
842014
An evaluation of wearable sensors and their placements for analyzing construction worker's trunk posture in laboratory conditions
W Lee, E Seto, KY Lin, GC Migliaccio
Applied ergonomics 65, 424-436, 2017
802017
Workforce development: understanding task-level job demands-resources, burnout, and performance in unskilled construction workers
W Lee, GC Migliaccio, KY Lin, EYW Seto
Safety Science 123, 104577, 2020
772020
Training of low-literacy and low-English-proficiency Hispanic workers on construction fall fatality
KY Lin, W Lee, R Azari, GC Migliaccio
Journal of Management in Engineering 34 (2), 05017009, 2018
712018
Exploring the influence of system quality, information quality, and external service on BIM user satisfaction
J Song, GC Migliaccio, G Wang, H Lu
Journal of Management in Engineering 33 (6), 04017036, 2017
642017
Procurement of design-build services: Two-phase selection for highway projects
GC Migliaccio, GE Gibson, JT O’connor
Journal of management in engineering 25 (1), 29-39, 2009
512009
Changing project delivery strategy: An implementation framework
GC Migliaccio, GE Gibson Jr, JT O'connor
Public works management & policy 12 (3), 483-502, 2008
502008
Wearable physiological status monitors for measuring and evaluating workers’ physical strain: Preliminary validation
UC Gatti, GC Migliaccio, S Schneider
Computing in Civil Engineering 2011, 194-201, 2011
412011
Key Implementation Issues and Lessons Learned with Design-Build Projects
GE Gibson, JT O'Connor, GC Migliaccio, J Walewski
Alternative Project Delivery, Procurement, and Contracting Methods for …, 2007
40*2007
Study of the relationship between procurement duration and project performance in design-build projects: Comparison between water/wastewater and transportation sectors
SM Bogus, GC Migliaccio, R Jin
Journal of Management in Engineering 29 (4), 382-391, 2013
392013
Guide for design management on design-build and construction manager/general contractor projects
E Minchin, L Ptschelinzew, GC Migliaccio, U Gatti, K Atkins, T Warne, ...
NCHRP report, 2014
342014
Effect of duration of design–build procurement on performance of transportation projects
GC Migliaccio, SM Bogus, A Chen
Transportation research record 2151 (1), 67-73, 2010
332010
系統目前無法執行作業,請稍後再試。
文章 1–20